SOP: Client Report and Schedule Procedure (Quick Step Guide)
Purpose
This quick step guide provides a rapid checklist to compile client performance data, generate reports (Mid-Term or Renewal), and schedule upcoming promotions without manual database searching or redundant logging.
Phase 1: Rapid Data Gathering (10–12 Minutes)
1. URLs & Dates via WP Sheet Editor
- Open WP Sheet Editor > Edit Posts $\rightarrow$ Search client name + reporting date window $\rightarrow$ Copy blog post titles and URLs from the View column.
- Open WP Sheet Editor > Edit Classifieds $\rightarrow$ Search client name + reporting date window $\rightarrow$ Copy classified titles and URLs from the View column.
- Open WP Sheet Editor > Edit Business Listings (or Edit Pages) $\rightarrow$ Search client name $\rightarrow$ Copy the main listing URL and related directory category links.
- (If Renewal) Copy the Donation Support and active Feature links.
2. Page & Post Views via Native WordPress Lists
- In the WordPress left-hand admin menu, open Posts > All Posts and Classifieds > All Classifieds.
- Type the client name in the top-right search box on each screen.
- Transcribe the hit counts shown in the native Views column (powered by Post Views Counter) for their specific blog posts and classifieds.
- Pull cumulative listing and category page views from your site analytics/counter tool.
3. Social Media Links & Reach
- Open your Master Social Schedule Spreadsheet:
- Filter Client by the business name.
- Filter Date for the reporting window.
- Copy the live social post links (Facebook, Instagram, LinkedIn, Google Business).
- Open Meta Business Suite > Insights > Content:
- Export the CSV for the reporting period and sum total reach figures for the client's posts.
4. Keyword Rankings & Site Totals
- Check current Google rankings for target search phrases (e.g., No. 1, No. 2).
- Note site-wide visitors, page views, and Google search impressions for the period.
Phase 2: Automated Report Generation (2–3 Minutes)
- Open Gemini and select the appropriate Gem:
- Mid-Term Report Gem (for 3-month / 6-month mid-point reviews).
- Renewal Report Gem (for annual / full-term contract completions).
- Upload the gathered stats or completed client spreadsheet.
- Run the prompt:"Please generate the [Mid-Term / Renewal] Report for [Client Name] based on the attached data. Embed all direct links into the wording, calculate the Hits Summary, provide customized Insights & Recommendations for each section, and draft the Looking Ahead strategy."
- Verify link accuracy, calculation totals, and forward-looking strategy points.
Phase 3: Assembly & Client Delivery (5 Minutes)
- Paste the generated report into your client document or email body.
- In the YOUR ONLINE ADVERTS section, insert active screenshots of their live adverts (e.g., Sticky Top-of-Page Advert, Side Scrolling Logo).
- Send via Fluent CRM using the corresponding email template:
- Mid-Term: Request confirmation of target keywords and content updates for the second half of their term.
- Renewal: Advise that the renewal invoice will issue under separate cover and invite them to update upcoming term goals.
- Set a calendar reminder for 7 days to complete post-report follow-up and scheduling.
Phase 4: Post-Report Follow-Up & Scheduling (Completed 7 Days Later)
- Confirm client feedback, approved changes, or invoice status.
- Run your 6-Month / 12-Month Diary Prompt or 3-Monthly Schedule Procedure in Gemini to map out upcoming dates.
- Add the new campaign dates directly to your Master Social Schedule Spreadsheet.
- Run the Client Promo Schedule Extractor to generate their personalized promo schedule and send the confirmation email via Fluent CRM.
Old Procedure below to delete once above confirmed -
When your task is generated for a Mid-term or Renewal Report -
Step 1: What to do TODAY (The Report)
- Go to your "This Week" Board or your Master Client Pipeline (wherever the spawned report tasks are currently sitting).
- Open their FluentCRM Contact Profile to look at their history.
- Write and send them their Mid-Term or Renewal report.
- Create a 3-6 month schedule ready for full development the following week
- Complete/delete the spawned task on the board. (If it is a renewal, remember to re-apply the
Automation Ready tag in the CRM!)
Step 2: The 7-Day Wait
- Do not run the new GEM Planner today. * Set a diary reminder for exactly 7 days from now to do their 3-6 month scheduling. Let them digest the report you just sent them first.
Step 3: What to do NEXT WEEK (The Schedule)
- When your 7-day reminder goes off, open your AI GEM.
- Paste in the short prompt we just finalized with their details.
- Let the AI generate the table and draft the email.
- Copy the table directly into your new Master GEM Planner Spreadsheet.
- Send the email to the client!